Upgrade Kit 12-15/16 Long Leads AAMI

Diagnostic ECG Patient Cables and Leads

Find lignende produkter

Long Upgrade Kit shielded 12-15/16 leads AAMI color coded for PageWriter TC 70. Consisting of 4 additional long lead assy (48" (1.22m0)), 6 shorting plugs, lead separators, 6 colored clips, 6 colored rings, 4 brown base rings and instructions for use. The additional lead sets come pre-assembled with the brown base rings. 1 kit = 1 sales unit.

Specifikationer

ECG Diagnostic ECG Patient Cables and Leads
ECG Diagnostic ECG Patient Cables and Leads
Patient Application
  • Child; Adult
Application Site
  • Limb; Chest
Number of Leads
  • 16
Shielded
  • Shielded
Electrode Attachment Method
  • Alligator Clip
Color Coding
  • AAMI
Product details
Product details
Use with Non-Philips Healthcare Equipment
  • No
Use with Philips Healthcare Equipment
  • 860315, 860310
Product Category
  • ECG
Product Type
  • Diagnostic ECG Patient Cables and Leads
CE Certified
  • No
Single-Patient Use OR Multi-Patient Use
  • Multi-Patient Use
Packaging Unit
  • 1
Not manufactured with natural rubber latex
  • Yes
Minimum Shelf Life
  • None
Sterile OR Non-Sterile
  • Non-Sterile
Use with Other Supplies
  • N/A
ECG Diagnostic ECG Patient Cables and Leads
ECG Diagnostic ECG Patient Cables and Leads
Patient Application
  • Child; Adult
Application Site
  • Limb; Chest
Product details
Product details
Use with Non-Philips Healthcare Equipment
  • No
Use with Philips Healthcare Equipment
  • 860315, 860310
See all specifications
ECG Diagnostic ECG Patient Cables and Leads
ECG Diagnostic ECG Patient Cables and Leads
Patient Application
  • Child; Adult
Application Site
  • Limb; Chest
Number of Leads
  • 16
Shielded
  • Shielded
Electrode Attachment Method
  • Alligator Clip
Color Coding
  • AAMI
Product details
Product details
Use with Non-Philips Healthcare Equipment
  • No
Use with Philips Healthcare Equipment
  • 860315, 860310
Product Category
  • ECG
Product Type
  • Diagnostic ECG Patient Cables and Leads
CE Certified
  • No
Single-Patient Use OR Multi-Patient Use
  • Multi-Patient Use
Packaging Unit
  • 1
Not manufactured with natural rubber latex
  • Yes
Minimum Shelf Life
  • None
Sterile OR Non-Sterile
  • Non-Sterile
Use with Other Supplies
  • N/A
  • Product may not be available in all geographies, please check with your Philips representative for complete portfolio availability.

You are about to visit a Philips global content page

Continue

You are about to visit a Philips global content page

Continue

Vores websted vises bedst med den nyeste version af Microsoft Edge, Google Chrome eller Firefox.