Upgrade Kit 12-15/16 long leads IEC

Diagnostic ECG Patient Cables and Leads

Find lignende produkter

Long Upgrade Kit banana posts shielded 12-15/16 leads IEC color coded for pageWriter TC 70. Consisting of 4 additional long lead assy (48" (1.22m)), 6 shorting plugs, 2 lead separators 3.4 diameter, 4 banana post adapters, 6 colored rings, 4 white base rings and instructions for use. The long additions lead sets come pre-assembled with the white base ring and the banana post adapters. 1 kit = 1 sales unit.

Specifikationer

Product details
Product details
Product Category
  • ECG
Use with Non-Philips Healthcare Equipment
  • No
Use with Philips Healthcare Equipment
  • 860315, 860310
Product Type
  • Diagnostic ECG Patient Cables and Leads
CE Certified
  • Yes
Single-Patient Use OR Multi-Patient Use
  • Multi-Patient Use
Not manufactured with natural rubber latex
  • Yes
Packaging Unit
  • 1
Minimum Shelf Life
  • None
Sterile OR Non-Sterile
  • Non-Sterile
Use with Other Supplies
  • N/A
ECG Diagnostic ECG Patient Cables and Leads
ECG Diagnostic ECG Patient Cables and Leads
Patient Application
  • Child; Adult
Application Site
  • Limb; Chest
Lead Set Length
  • ?
Number of Leads
  • 16
Shielded
  • Shielded
Electrode Attachment Method
  • Alligator Clip
Color Coding
  • IEC
Product details
Product details
Product Category
  • ECG
Use with Non-Philips Healthcare Equipment
  • No
ECG Diagnostic ECG Patient Cables and Leads
ECG Diagnostic ECG Patient Cables and Leads
Patient Application
  • Child; Adult
Application Site
  • Limb; Chest
See all specifications
Product details
Product details
Product Category
  • ECG
Use with Non-Philips Healthcare Equipment
  • No
Use with Philips Healthcare Equipment
  • 860315, 860310
Product Type
  • Diagnostic ECG Patient Cables and Leads
CE Certified
  • Yes
Single-Patient Use OR Multi-Patient Use
  • Multi-Patient Use
Not manufactured with natural rubber latex
  • Yes
Packaging Unit
  • 1
Minimum Shelf Life
  • None
Sterile OR Non-Sterile
  • Non-Sterile
Use with Other Supplies
  • N/A
ECG Diagnostic ECG Patient Cables and Leads
ECG Diagnostic ECG Patient Cables and Leads
Patient Application
  • Child; Adult
Application Site
  • Limb; Chest
Lead Set Length
  • ?
Number of Leads
  • 16
Shielded
  • Shielded
Electrode Attachment Method
  • Alligator Clip
Color Coding
  • IEC
  • Product may not be available in all geographies, please check with your Philips representative for complete portfolio availability.

Vores websted vises bedst med den nyeste version af Microsoft Edge, Google Chrome eller Firefox.